A list of terms, keywords, abbreviations, and acronyms used in reporting system.
Data format for Oracle Primavera P6 software. May also refer to a standalone project schedule file created in Oracle Primavera P6. XER is an abbreviation for eXport Eagle Ray, Primavera’s proprietary data export format.
The actual duration for an activity or work package at a given time reference.
The total working time from the actual start date to the actual finish date for a completed activity or work package, or the total working time from the actual start date to the data date for in-progress activity or work package.
The remaining duration for an activity or work package at a given time reference.
The total working time from the remaining start date to the remaining finish date for an activity or work package.
An umbrella term for a schedule submission such as a baseline schedule, a schedule update, a recovery schedule, or a scenario planning schedule.
A baseline schedule version. Commonly referred to as ‘baseline’. Also referred to as as-planned schedule version or planned schedule version.
May refer to an approved baseline schedule version. An approved baseline schedule version may be the first approved version, a subsequent version, or the latest approved version of the project schedule. A project’s progress may be tracked to multiple baseline schedule versions.
A current schedule version. The latest published schedule version. Used in the context of forensic scheduling, and time variation analysis.
Last Schedule Version
Alphanumeric Naming Convention is a convenient format to monitor the number of schedule submissions, schedule version history, and version control – as well as, to obtain a snapshot of the project’s performance for every schedule submission. As part of the schedule version history, the source of schedule submissions is also tracked.
Alphanumeric Naming Convention is a convenient format to monitor the number of schedule submissions, schedule version history, and version control – as well as, to obtain a snapshot of the project’s performance for every schedule submission. As part of the schedule version history, the source of schedule submissions is also tracked.
No. | Head 1 | Head 2 |
---|---|---|
01 | Variation A change in the quantity of scope, time, and/ or cost – typically between two or more sets of data. Any difference between the circumstances and/ or content of the contract work as carried out, compared with the circumstances and/ or content under which the work is described in the contract documents as required to be or intended to have been carried out. Variation can be further classified as the following:
| Variation Analysis (Stoneboy) An assessment or investigation into the causes and effects of variations in a project namely:Scope Variation from baseline scope, Time Variation from baseline schedule, and Cost Variation from baseline cost. |
02 | SV (Scope Variation ) (Stoneboy) An instance of variation in project scope. Frequently, an exception or exclusion from the baseline scope. Scope variation can mean an increase in scope (additional scope of work, extra work), or a decrease in scope (scope reduction). | SVA (Scope Variation Analysis) (Stoneboy) Assessment of approved or involuntary changes in the project scope. Assessment of scope variations from the baseline scope. |
02 | TV (Time Variation ) (Stoneboy) An instance of variation in the project schedule. Frequently, an exception or exclusion from the baseline schedule. Time variation may refer to an increase in time (delay), or a decrease in time (schedule gain). In this report, the term is frequently used in the context of delays, especially critical delays experienced in the project – irrespective of the apportionment of delay. This may include additional direct time, indirect time, overhead time, cumulative time impact of variation events, and project administration.Also see Delay, and Critical Delay. | TVA (Time Variation Analysis ) (Stoneboy) |
02 | CV (Cost Variation) (Stoneboy) An instance of variation in project cost. Frequently, an exception or exclusion from the baseline cost. Cost variation may refer to an increase in cost (i.e. cost overrun due to changes, delays, etc.), or a decrease in cost (cost reduction). In this report, the term is frequently used in the context of cost overrun and financial losses for the project as a whole. Cost Variation may include additional direct cost, indirect cost, overhead cost, cumulative cost impact of variation events, and project administration. | CVA (Cost Variation Analysis) (Stoneboy) Quantification of cost reduction, or cost overrun, and/or damages. Assessment of cost variations from the baseline cost. Analysis of baseline cost versus actual/ as-built / at completion cost over a period of time. Identification, assessment, quantification, and summarization of approved and/or involuntary changes in the project budget. |
Reference information for schedule version number, and names is provided below.
Month | Month & Year | Schedule Version | Data Date | Print Date (Publish Date) | Substantial Completion (MS85) | Slippage | Note |
---|---|---|---|---|---|---|---|
0 | Aug 2021 | 0-A Contractor’s Draft Schedule | 2021-09-13 (assumed data date) | 2021-09-07 | 2023-12-29 |
| |
0 | Aug 2021 | 0-B Contractor’s Draft Schedule | 2021-10-04 (assumed data date) | 2021-10-05 | 2023-12-29 |
| |
1 | Sep 2021 | ||||||
2 | Oct 2021 | ||||||
3 | Nov 2021 | 3-C Schedule Update | 2021-11-12 (assumed data date) | 2021-11-12 | 2024-02-14 | 🔺-48 cd 🔺-33 wd |
|
3 | Nov 2021 | 3-D Schedule Update | 2021-11-26 (assumed data date) | 2021-11-26 | 2024-02-23 | 🔺-57 cd 🔺-393 wd |
|
4 | Dec 2021 | ||||||
5 | Jan 2022 | ||||||
6 | Feb 2022 | 6-D Schedule Update | 2022-02-10 (assumed data date) | 2022-02-10 | 2024-04-08 | 🔺-102 cd 🔺-69 wd |
|
7 | March 2022 | ||||||
8 | April 2022 | 8-D Schedule Update | 2022-04-11 (assumed data date) | 2022-04-21 | 2024-05-03 | 🔺-127 cd 🔺-88 wd |
|
9 | May 2022 | ||||||
10 | June 2022 | 10-D Schedule Update | 2022-06-24 (assumed data date) | 2022-06-30 | 2024-07-04 | 🔺-189 cd 🔺-130 wd |
|
11 | July 2022 | ||||||
12 | Aug 2022 | ||||||
13 | Sep 2022 | ||||||
14 | Oct 2022 | ||||||
15 | Nov 2022 | 15-D Schedule Update | 2022-11-08 (assumed data date) | 2022-11-17 | 2024-08-27 | 🔺-243 cd 🔺-168 wd |
|
16 | Dec 2022 | ||||||
17 | Jan 2022 | 17-D Schedule Update | 2023-01-30 (assumed data date) | 2023-02-09 | 2024-07-24 | 🔺-209 cd 🔺-144 wd |
|